Projects | Hall Constructors

showing 71 to 78 of 78 on page 8 |     4  5  6  7  8  
Contract Value

$560,000

Location

4000 Main St, Vancouver

Completion Date

February 18, 2013

Description

This property at Main St and King Edward Ave in Vancouver was previously occupied by a gas station resulting in widespread gasoline contamination in the site soil. Although the majority of the soil within the property was removed as part of the initial remediation process by others, Hall identified and removed remaining soil that had contamination levels exceeding acceptable standards. The remaining 3,500 m3 of material was used to build ramps and pads to complete the pile driving and shotcrete shoring. Upon completion of the shoring, all excess material was hauled off site and detail excavation was completed for the foundation of this mixed-use residential development.

Contract Value

$450,000

Location

848 Royal Ave, New Westminster

Completion Date

March 27, 2013

Description

Hall Constructors was contracted by Chysik Project Management to complete the excavation and shoring for the sedoncd phase of a townhouse development on Royal Avenue in New Westminster. Hall utilized the sloping grade surrounding this site to complete the 7,500 m3 excavation quickly and efficiently. Attention to detail was necessary for the shoring on the zero wall which was constructed on three sides of the site.

Contract Value

$420,000

Location

1388 Continental St, Vancouver

Completion Date

April 21, 2014

Description

Hall Constructor completed this small excavation and shoring project for Cressey Developments. The major challenges on this site were working on a small building footprint with limited access and sloped surroundings. Hall also worked closely with the geotechnical Engineer to ensure that underpinning of the neighboring building and Granville St Bridge footings was done safely and correctly.

Contract Value

$418,000

Location

UBC Campus, Vancouver, BC

Completion Date

May 31, 2012

Description
This is the second part of the UBC Ponderosa development. The east and the west building are separated by the Lower Mall and are located at the west end of the UBC campus. Excavation began late February, and was completed in May 2012. The total excavation volume of this building was approximately 3,000m3.
Contract Value

$382,400

Location

19498 - 92 Avenue, Surrey, B.C.

Completion Date

October 15, 2015

Description

Clearing, excavation, granular fill, gravel installation, and asphalt paving. BD Hall proposed a modification of pavement structure which permitted installation of asphalt paving within three weeks of startup during busy paving season - this allowed Finning additional time to re-position equipment to other facilities prior to arrival of new equipment.

Contract Value

$339,000

Location

Sustainability Street, UBC Campus

Completion Date

December 31, 2014

Description

Scope of work including replacing existing 200mm watermain with 250mm, site demolition, grading, underground utilities.

Contract Value

$300,000

Location

1190 West 6th Avenue, Vancouver

Completion Date

August 31, 2012

Description

Hall Constructors completed the excavation and shoring for this townhome development at 6th Ave & Alder St in Vancouver, working with Chysik Project Management. Tight working constraints, hard sandstone boulders and extremely steep grade of the site added to the complexity of the project.

Contract Value

$228,000

Location

UBC Athletics Precinct - Wesbrook Mall & 16th Avenue, UBC

Completion Date

May 31, 2015

Description

Excavated 3,900m3 and placed 3,400m3 of engineered fill. Job completed on schedue despite inclement weather.