Projects | Hall Constructors

showing 41 to 50 of 82 on page 5 |     1  2  3  4  5  6  7  8  9    
Contract Value

$1,255,000

Location

238 W Broadway, Vancouver

Completion Date

July 8, 2015

Description

Hall Constructors was contracted by Ventana Construction Corp. to complete the excavation and shoring for this new development which includes ground floor commercial with residential condos above. Since anchors could not be drilled at one corner of the site, Hall installed a steel bracing system to retain wall of the excavation. Hall also brought in additional equipment to break through the bedrock and boulders that were present at the bottom of the excavation.

Contract Value

$4,668,000

Location

Coquitlam, BC

Completion Date

June 15, 2015

Description

Construction of 40,000 m3 Earthen Flood Dyke, installation of sheetpile flood wall, relocation of existing utilities. Emergency access from Mary Hill Bypass including 12,000 m3 of Granular fill, an open bottom Arch culvert with Retaining Wall. Many difficulties presented themselves on this project, the most prevalent were sourcing and placing specified dyke fill material, driving plastic sheet piles into heavily consolidated ground plus working in and around a heavily secured facility.

Contract Value

$815,000

Location

117 First St West, North Vancouver

Completion Date

May 31, 2015

Description

This 14,000 m3 excavation & shoring job for Marcon Construction was completed on schedule and on budget in 2015 by utilizing their ocean disposal facility. Special care was taken to retain and underpin a heritage building on the corner of the site.

Contract Value

$228,000

Location

UBC Athletics Precinct - Wesbrook Mall & 16th Avenue, UBC

Completion Date

May 31, 2015

Description

Excavated 3,900m3 and placed 3,400m3 of engineered fill. Job completed on schedue despite inclement weather.

Contract Value

$720,000

Location

1568 E King Edward Ave, Vancouver

Completion Date

March 30, 2015

Description

Hall Constructors completed this excavation and shoring project for Performace Construction in 2015. At the beginning of the project, Hall worked with the environmental engineer to locate and remove over 1,000 m3 of contaminated soil and one underground oil storage tank. Once the site was remediated, Hall progressed the excavation on the small lot by using the back lane and temporary ramps to maintain access.

Contract Value

$860,000

Location

611 Regan Ave, Coquitlam

Completion Date

March 13, 2015

Description

Hall Constructors completed the excavation & shoring, as well as the offsite civil work on this townhouse project for Marcon Construction. Due to limited working space in this residential neighbourhood, Hall worked with the Owner on phasing the work in order to facilitate the construction of the building once it was at grade.

Contract Value

$1,900,000

Location

396 East 1 St Avenue, Vancouver

Completion Date

February 28, 2015

Description

Under contract with Onni, Hall Constructors completed this 35,000 m3 excavation & shoring project using their barge facility for ocean disposal of all clean, native material. Hall was able to work with Onni to phase the excavation and allow the formwork contractor to begin early work on the back half of the site while Hall finished at the front. This meant that the first suspended slab could be poured before the detail excavation was complete.

Contract Value

$339,000

Location

Sustainability Street, UBC Campus

Completion Date

December 31, 2014

Description

Scope of work including replacing existing 200mm watermain with 250mm, site demolition, grading, underground utilities.

Contract Value

$5,000,000

Location

Willingdon Ave & Lougheed Highway, Burnaby

Completion Date

December 20, 2014

Description

Hall Constructors was contracted by EllisDon to complete the offsite civil work at Brentwood Mall for Shape Properties. This extensive project included utility relocation and roadwork upgrades which needed to be completed before redevelopment of the existing mall could begin. While this work was on two very busy roadways, Hall worked closely with the City, Owner and Consultants to execute the work with minimal impacts to the public.

Contract Value

$2,500,000

Completion Date

November 30, 2014

Description

Storm and Sanitary upgrades, road re-construction and improvements to Knight Street, Jacombs Road and Sweden Way, BC Hydro and Telus civil installation.