Projects | Hall Constructors

showing 41 to 50 of 78 on page 5 |     1  2  3  4  5  6  7  8    
Contract Value

$1,528,000

Location

Langley, BC

Completion Date

June 30, 2011

Description

The Anthem Glover project involves the construction of an Automall Access road, including storm sewers, large underground detention system, water mains, curb & gutter, paving sidewalks, street lighting, traffic signals, and highway widening. The project is located at the busy intersection of Langley Bypass and Glover Road. After completion, the Automall will become one of City of Langley’s landmarks, selling high end luxury European make vehicles and is set to open in the summer of 2011. The large underground concrete storm water detention tank system, seventy meters in length and storing close to 4000m3 of storm water, is one of the most challenging and unique aspects of this large private development project.

Contract Value

$1,490,000

Location

16th Avenue & Stride Ave, Burnaby

Completion Date

October 15, 2013

Description

Hall Constructors completed the site preparation and bulk excavation for Marcon Construction on the Portraits project in Burnaby. The work for this residential condo development involves diverting the existing underground utilities, bulk excavation of 17,000 m3, shoring, detail excavation and extending the existing creek through the property. The creek work was executed during the DFO’s fisheries window to minimize impact on the existing fish habitat.

Contract Value

$1,480,000

Location

Vancouver, BC

Completion Date

December 31, 2012

Description

The Great Northern Way Campus Lot “O” project involves clearing and grubbing and off-site disposal of vegetation and debris from the work area, installation and maintenance of erosion and sediment control facilities, stripping and earthworks for approximately 36,000 metric tonnes of road embankment construction, temporary lock-block retaining wall and retaining wall drainage.

Contract Value

$1,387,000

Location

Coquitlam, BC

Completion Date

October 31, 2012

Description

Site servicing, utility installation and road works for a 34 lot residential subdivision located in Coquitlam.

Contract Value

$1,375,000

Location

7711 18th Street, Burnaby

Completion Date

February 28, 2017

Description

Hall Constructors is completing this initial phase of offsite civil work for Marcon Construction, which will provide access to Ledingham McAllister's master planned Southgate City. The work will include a new access road, complete with storm, sanitary, water, BC Hydro and street light upgrades as well as a fully signalized intersection at Griffith's Drive.

Contract Value

$1,300,000

Location

Taylor Way and Keith Road in West Vancouver

Completion Date

November 1, 2015

Description

Excavation and shoring for a senior care home living complex. This project included the construction or permanent shotcrete walls that were finished to match the natural rock outcrops in the area.

Contract Value

$1,277,000

Location

148th Street and 61 Avenue, Surrey, BC.

Completion Date

September 30, 2012

Description

On & off-site servicing for a 91 unit townhouse site. The project consists of site servicing for a 91 unit townhouse site which includes 500m of new road construction, storm, sanitary and water services, electrical, hydro, Telus and cable connections. The project also consists of significant onsite earth works and approximately 100 lm of retaining construction.

Contract Value

$1,255,000

Location

238 W Broadway, Vancouver

Completion Date

July 8, 2015

Description

Hall Constructors was contracted by Ventana Construction Corp. to complete the excavation and shoring for this new development which includes ground floor commercial with residential condos above. Since anchors could not be drilled at one corner of the site, Hall installed a steel bracing system to retain wall of the excavation. Hall also brought in additional equipment to break through the bedrock and boulders that were present at the bottom of the excavation.

Contract Value

$1,251,000

Location

76A Ave & 156 St, Surrey, BC.

Completion Date

August 31, 2012

Description

24 Lot Subdivision and Site Servicing. Scope of work consisting of tree clearing and lot preparation, utility install, roads and hard surface treatments.

Contract Value

$1,236,000

Location

West end of the UBC campus

Completion Date

May 31, 2012

Description

This new UBC mixed development is managed by Ledcor Construction. The building will serve as residence and lecture hall for students. Excavation began in late January 2012, and was completed in May 2012. The total excavation volume of this phase was approximately 17,000m3. The challenges of this project were the pedestrian traffic management and aggressive schedule objectives.

showing 41 to 50 of 78 on page 5 |     1  2  3  4  5  6  7  8